Samcheok Thermal Power Plant #1, 2 / Turbine & BOP Erection Sam-cheok Doosan Heavy Industries STG & BOP (1,040MW x 2Unit) 2020 ~ 2024
Gangneung Anin Thermal Power Plant #1, 2 / Turbine & BOP Erection Gang-neung Samsung C&T STG & BOP (1,040MW x 2Unit) 2019 ~ 2022
Bukpyeong Thermal Power Plant / #1,2 Boiler Installation Gang-neung STX Heavy Industries (595MW)Boiler 15,492ton x 2Unit 2014 ~ 2016
Shinboryoung Thermal Power Plant / #1,2 Turbine & BOP Erection Bo-ryoung GS E&C STG & BOP(1,000MW x 2Unit) 2014 ~ 2017
Dangjin Thermal Power Plant / #9 Turbine & Generator Erection Dang-jin Hyundai E&C STG (1,020MW x 1Unit) 2013 ~ 2016
Tae-an Thermal Power Plant / #9,10 Steel Str Erection Tae-an DLE&C (595MW)Steel Structure Erection(15,419ton x 2Unit) 2013 ~ 2016
Taean Thermal Power Plant #7,8 / Boiler&Steel Str. construction Work Tae-an Doosan Heavy Industries (500MW) Boiler& Steel Structure 1,690T/H x 2Unit 2004 ~ 2007
Youngnam Thermal Power Plant / Boiler & Insulation Young-nam Hyundai E&C (200MW)Boiler x 2Unit 2002 ~ 2004
Taean Thermal Power Plant #6 Piping Construction Work Tae-an Daewoo E&C (500MW)Boiler Piping x 1Unit 1999 ~ 2002
Taean Thermal Power Plant #2,4 / Boiler Steel structrue Work Tae-an Doosan Heavy Industries (500MW) Boiler& Steel Structure 1,690T/H x 2Unit 1995 ~ 1998
Hadong Thermal Power Plant #1~6 / Boiler & Steel Str. Construction Work Ha-dong Doosan Heavy Industries (595MW)1720 T/H Boiler & Steel Str. x 4Unit (Inc. Piping) 1994 ~ 2001
Boryoung Thermal Power Plant #3~6 / Boiler Construction Work Bo-ryoung Doosan Heavy Industries 1720 T/H Boiler x 500MW 4Unit 1991 ~ 1994